Thursday, July 9, 2009
The Kitchen
Posted by Reagan at 4:44 PM 2 comments
Labels: House Remodel, Kitchen
Wednesday, June 10, 2009
More Kitchen
Posted by Reagan at 11:00 AM 2 comments
Labels: House Remodel, Kitchen
Monday, May 4, 2009
List Time
Work By Room
Kitchen
- Paint Vanity (replacing work table)
- Remove Corner Cabinet if Fridge is too Tall
- Install New Refridgerator
- Paint Trim in Kitchen (trim already up)
- Find/Paint Floor Trim
- Install Floor Trim
- Install Shelves & Cabinet Next to Microwave
- Finish Electrical for Dishwasher/Microwave
- Finish Plumbing for Dishwasher/Microwave
- Install Dishwasher & End Panels for Countertop
- Install Counter Tops (3 areas)
- Install Sink
- Install Faucet
- Install Light Fixtures (Located in Attic)
- Remove Gas Pipe Behind Stove
- Paint Ceiling?
- Fill Wall Anchor Holes
- Paint Filled Holes
- Fix Electrical in Back Part of Kitchen?
- Find Door, Closet, Floor Trim
- Prime/Paint Trim
- Install Floor Trim
- Install Door/Closet Trim
- Caulk All Trim
- Spray Paint Doorknob
- Install Doorknob
- Fix Mud Coating?
- Stain Vent Cover Same as Wood Floor (Espresso)
- Prime/Paint Built-In's
- Find Door, Closet, Floor Trim
- Prime/Paint Trim
- Install Floor Trim
- Install Door/Closet Trim
- Caulk All Trim
- Spray Paint Doorknob
- Install Doorknob
- Fix Mud Coating?
- Paint Ceiling
- Stain Vent Cover Same as Wood Floor (Espresso)
- Buy Curtains, Move Red Curtains to Baby Room
- Find Floor Trim
- Prime/Paint Floor Trim
- Install Floor Trim
- Buy Trim for Vents (Quarter Round?)
- Buy Trim for Front Door Header
- Prime & Paint Door Header Trim
- Install Door Header Trim
- Fix Mud on Ceiling (Ceiling Hole) /Fix Other Mud Areas?
- Paint Ceiling
- Caulk Door Trim
- Paint Door Trim
- Caulk Floor Trim & Door Trim
- Paint Floor Trim
- Recaulk Bathtub/Surround
- Cut Hole For Vent, Put in Metal Vent Cover
- Shopvac Webs & Dirt
- Tear Down Room Walls
- Add A Light?
- Fill Cracks in Walls/Floor
- Paint Walls
- Bring One Box Down at a Time to go through/organize
- Install Fixed Attic Window/Check Other Window
- Install Light?
- Roto-till Roots on North Side of Front Yard
- Up Keep Front Yard (grass seed, water, mow)
- Remove Flower Bed Border on N Side of Porch and Seed w/ Grass (Spread Stones on N Side of House)
- Border Tree w/ Cobblestones and Mulch
- Remove Swing Set
- Build Steps Out from Back Door (Brick/Stone)
- Build Patio Out the Back Door (Brick/Stone)
- Buy Paint
- Prime Exterior of House
- Paint Exterior Trim
- Paint Exterior Walls
- Paint Porch
Work By Project
This is basically from the list above, just organized by project so that we don't end up doing the same thing four times such as painting trim.
Organize Trim
Kitchen, Front Bedroom, Back Bedroom, Living Room
Prime/Paint Trim
Kitchen, Front Bedroom, Back Bedroom, Living Room
Install Floor Trim
Kitchen, Front Bedroom, Back Bedroom, Living Room
Install Door Trim
Front Bedroom, Back Bedroom
Install Closet Trim
Front Bedroom, Back Bedroom
Caulk Trim After Installed by Room
Kitchen, Front Bedroom, Back Bedroom, Living Room, Bathroom
Spray Paint Door Knobs
Front Bedroom, Back Bedroom
Install Door Knobs
Front Bedroom, Back Bedroom
Stain Vent Covers
Front Bedroom, Back Bedroom
Fix Mudding on Walls
Front Bedroom, Back Bedroom, Living Room
Paint Ceilings
Kitchen, Back Bedroom, Living Room
Posted by Reagan at 11:04 AM 1 comments
Labels: House Remodel, jere, Summer
Tuesday, April 28, 2009
Progress!
- The weekend started when I cleaned out my closet and took 3 full bags of clothes to Branded on Thursday. I now have about $30 in store credit! I gave the rest of the clothes to my mom to go through. It feels so good to get rid of clothes I haven't been wearing since being pregnant and won't wear after I'm done being pregnant. I'm pretty sure that got me motivated for the weekend.
- I got 6 shelves and the 9" cabinet that I bought primed with two coats of paint each. I got the final coats of paint done tonight.
- I installed the bracing for the pantry shelving in the back part of our kitchen. I need to move one of the braces though because I forgot that I have a short shelf that will go on the top level.
- I made a stick arrangement for the bare space on our wall where Jere's sculpture was before it got taken to the student art show. I like it because it's random and kind of wild.
- I cleaned the porch so our house looks a little less ghetto (old screen door, cardboard box, stick pile, trash box etc) which made room for me to paint my shelves.
- I rearranged the living room and got all of the tools out of our living space. I moved the TV cabinet into the living room and we've watched several movies on our TV since then. It's so much more comfortable!
- Jere bought and installed mulch and cobblestone flower bed pavers to line the flowerbed I attempted to make a couple weeks ago. It looks so much better! He also bought grass seed and spread some around our yard. Hopefully it'll take to the ground.
- Jere also bought and set up a reel mower and weed wacker. Since we don't have a place to store a gas mower we bought a reel mower so we can carry it to the basement. We were joking that even though we don't own a gas mower, we are now officially adults because we own a mower!
Next up:
- Sand vanity that's replacing the stainless steel work table in kitchen.
- Prime and paint vanity, feet for vanity.
I need to post pictures soon. Hopefully I can get some taken.
P.S. Today I am 27 weeks along!
Posted by Reagan at 1:13 PM 5 comments
Labels: flowers, House Remodel, Kitchen, yard
Friday, August 29, 2008
Saturday, February 23, 2008
Relaxing is Nice
Posted by Reagan at 1:48 AM 0 comments
Labels: Cleaning, House Remodel, reagan
Wednesday, February 20, 2008
Booya! The Kitchen Floor Is Done!!!!
After tearing out the wood, I laid plywood in the "back" part of the kitchen to level it even with the "front" part of the kitchen. I ended up laying two layers of 3/4" plywood. I screwed the first layer to the subfloor and then screwed the second layer to the first layer.
Do I need to say anything about this?
After leveling everything there was still a lot of work to be done...First I had to choose a tile pattern.
I guess I should explain what I did first. I work for an architecture firm that has an interior design side. They had a bunch of extra tiles and I was told I could take whatever I needed. I ended up buying four boxes of cheap neutral tile to blend things together and fill in the cracks. This should explain why there are so many different colors and sizes of tile.
The other pattern. Neither one seemed to work for me...So I went with something else.
I decided to fit a pattern together "organically". This just means that I started a "random pattern" (oxymoron I know) But anyways I laid out the beginnings of a pattern and then cut peices to specifically fit where I needed them to go.
So then, after I dry fit my tiles together, I started the mortar process. Because I dry fitted the tiles, I had to remove them to mortar. At first I had a panic attack and called Jere home from school because I couldn't remember my "organic" pattern...Oh it was very terrifying. He came home and helped me set up a system so I could remember the general layout. Here's the thing..I wasn't soo worried about the pattern as I was about fitting the already cut tiles back where they needed to go. It was very frightening to think about not remembering the order and therefore having to re-cut tons more tile. See why it would be so terrifying???
This is the pattern I laid in the mortar (without grout yet)
I bought the mix-on your-own mortar. I had to borrow a plug-in drill to use my paddle to mix the grout (I only have a battery operated drill and the battery died on me while mixing. I would love to own a corded drill sometime soon)
So this is what it looked like after I was done with the mortar process...Not done yet though!
I still had to grout all the joints.
Oh yeah, this is what you look like when you stay up till 3:30am laying tile...See that piece of hair sticking out of the top of my head? (just look at the top of my head) that formed from leaning over for about 7 hours... AHH!
I waited for the mortar to set and proceeded to grout. I chose a color called "earth". It's a nice brown color. I mixed the grout once again with the corded drill (I need to return that to my kind freinds...) When mixing mortar and grout, I have found that you don't need to measure. You just mix until it's a little looser texture than peanut butter.
To grout, you need a float and a bucket of grout.

This is the grout before I wiped it off of the tile. When filling the cracks, it is best to push it all over so that every crack and joint is filled. This means that you will wipe it off later (while there may be a better way to do this, I like pushing grout around).

To wipe the grout off the tile, I used a sponge. Actually I think it's a drywall sponge. It did the trick. My goal was just to get the main stuff off, not to make it look all clean and shiny just yet.

This shot is a little blurry, but you ge the idea right? See the nice brown grout between the tiles?? Believe me, it's a sight for sore eyes! Oh grout how I love you so...

Oh yeah and this is what your hands might look like when you're done sponging grout...if you ever tiled your kitchen and grouted it. If you don't see what I am talking about, my hands are just really wrinkly. And white.

So this is what it looked like after I was done grouting. But wait! There is one more step! It's very important to seal the grout so that it can resist stains. See that rectangular tile? It's porous and so the grout got into the holes. I think those types of tiles are my favorite from now on. The grout just gives it more character.

So, on to the sealing. I used TileLab "SurfaceGard Penetrating Sealer". Also I bought two brushes originally thinking "oh, i'll just wizz through this with one brush in each hand." Well it really didn't take long with one brush and it ended up being too complicated using two brushes...What a waste of $.49.

Basically, I just ran my brush over the grout lines. I did two coats and it was a good sight to see the second coat pooling up because that meant the first coat was already working to propell whatever might fall on it. I just let the second coat dry naturally and seep into whatever holes might be left.

I also sealed some porous stone tiles. I didn't have all that many but it was fun to look at them and think to myself "ah, they are sealed nice and tight."

So this is my kitchen floor in all it's glory. Leveled, backerboard, mortar, tile, grout and sealer. Seems simple, but somehow it took me like 3-4 weeks....How did that happen?! It was supposed to take me like a couple days... :)

Here are some glamour shots of my favorite areas. I love the small peices that fit together. Kind of like a mosaic.

OOO see that thin thin long strip?? I love it.

I have realized that while I love working hard and doing this type of thing, the biggest satisfaction is integrating whatever I've worked on into my life. I will now start walking on the floor and proceed to forget what hard work it was. Then later on I will think to myself, pppsshaw that project'll only take like a day I'll just jump right on that. Then, inevitably it'll take longer and my freinds and family will just smile, encourage me and try not to look like they think I'm crazy. (of course I really do feel crazy sometimes) But then when everything is done, I ALWAYS have this huge feeling of accomplishment and it is one of the best feelings in the world. That is what working hard is all about.
Posted by Reagan at 10:40 PM 9 comments
Labels: House Remodel, Kitchen, reagan, Tile
Wednesday, January 16, 2008
Now We Are 'Normal' Home Owners!
Jere has been working on plumbing (he put all new plumbing in our bathroom, by himself) and two nights ago he dry fitted the PVC to replumb our kitchen sink. After he dry fitted it, he went ahead and glued it together (got done at 12:45 AM). Sooo the end result is that my kitchen sinks don't look like this as they waited for me to wash them in the bathroom :) Now I just happily wash them away in the proper sink. Sounds silly and some people would be happy with any sink, but IT DID MAKE THE PROCESS LONGER to transport as many dishes I could carry to the bathroom and then transport them out again (several trips). I guess I could have just washed my face over a pile of dishes? NAH.
Anyways, as far as I am concerned we are now 'normal' home owners with small projects to do. Next up, leveling the kitchen floor, tiling the kitchen and building counters.
Posted by Reagan at 4:25 PM 5 comments
Labels: House Remodel, jere, plumbing