Last night I made a list of all the things we need to do to finish the house. I just want to make it clear that Jere asked for this so we know what needs to be done. I made it so that it's a step by step list of what needs to happen in order for other things to happen. It looks daunting but I will start out having faith that we can be done before school starts in August...Maybe our list will make you feel better about yours. :)
Work By Room
Kitchen
- Paint Vanity (replacing work table)
- Remove Corner Cabinet if Fridge is too Tall
- Install New Refridgerator
- Paint Trim in Kitchen (trim already up)
- Find/Paint Floor Trim
- Install Floor Trim
- Install Shelves & Cabinet Next to Microwave
- Finish Electrical for Dishwasher/Microwave
- Finish Plumbing for Dishwasher/Microwave
- Install Dishwasher & End Panels for Countertop
- Install Counter Tops (3 areas)
- Install Sink
- Install Faucet
- Install Light Fixtures (Located in Attic)
- Remove Gas Pipe Behind Stove
- Paint Ceiling?
- Fill Wall Anchor Holes
- Paint Filled Holes
- Fix Electrical in Back Part of Kitchen?
- Find Door, Closet, Floor Trim
- Prime/Paint Trim
- Install Floor Trim
- Install Door/Closet Trim
- Caulk All Trim
- Spray Paint Doorknob
- Install Doorknob
- Fix Mud Coating?
- Stain Vent Cover Same as Wood Floor (Espresso)
- Prime/Paint Built-In's
- Find Door, Closet, Floor Trim
- Prime/Paint Trim
- Install Floor Trim
- Install Door/Closet Trim
- Caulk All Trim
- Spray Paint Doorknob
- Install Doorknob
- Fix Mud Coating?
- Paint Ceiling
- Stain Vent Cover Same as Wood Floor (Espresso)
- Buy Curtains, Move Red Curtains to Baby Room
- Find Floor Trim
- Prime/Paint Floor Trim
- Install Floor Trim
- Buy Trim for Vents (Quarter Round?)
- Buy Trim for Front Door Header
- Prime & Paint Door Header Trim
- Install Door Header Trim
- Fix Mud on Ceiling (Ceiling Hole) /Fix Other Mud Areas?
- Paint Ceiling
- Caulk Door Trim
- Paint Door Trim
- Caulk Floor Trim & Door Trim
- Paint Floor Trim
- Recaulk Bathtub/Surround
- Cut Hole For Vent, Put in Metal Vent Cover
- Shopvac Webs & Dirt
- Tear Down Room Walls
- Add A Light?
- Fill Cracks in Walls/Floor
- Paint Walls
- Bring One Box Down at a Time to go through/organize
- Install Fixed Attic Window/Check Other Window
- Install Light?
- Roto-till Roots on North Side of Front Yard
- Up Keep Front Yard (grass seed, water, mow)
- Remove Flower Bed Border on N Side of Porch and Seed w/ Grass (Spread Stones on N Side of House)
- Border Tree w/ Cobblestones and Mulch
- Remove Swing Set
- Build Steps Out from Back Door (Brick/Stone)
- Build Patio Out the Back Door (Brick/Stone)
- Buy Paint
- Prime Exterior of House
- Paint Exterior Trim
- Paint Exterior Walls
- Paint Porch
Work By Project
This is basically from the list above, just organized by project so that we don't end up doing the same thing four times such as painting trim.
Organize Trim
Kitchen, Front Bedroom, Back Bedroom, Living Room
Prime/Paint Trim
Kitchen, Front Bedroom, Back Bedroom, Living Room
Install Floor Trim
Kitchen, Front Bedroom, Back Bedroom, Living Room
Install Door Trim
Front Bedroom, Back Bedroom
Install Closet Trim
Front Bedroom, Back Bedroom
Caulk Trim After Installed by Room
Kitchen, Front Bedroom, Back Bedroom, Living Room, Bathroom
Spray Paint Door Knobs
Front Bedroom, Back Bedroom
Install Door Knobs
Front Bedroom, Back Bedroom
Stain Vent Covers
Front Bedroom, Back Bedroom
Fix Mudding on Walls
Front Bedroom, Back Bedroom, Living Room
Paint Ceilings
Kitchen, Back Bedroom, Living Room
1 comments:
Yeah your list makes me feel better about the things I want to get done. :)
Post a Comment